• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Home
  • Textile
    • Textile Calculation
    • Textile Flow Chart
    • Spinning
    • Yarn Manufacturing
      • Yarn Count
    • Textile Universities
    • Abbreviation
    • Template
  • Garments
    • Industrial Engineering (IE)
    • Standard Operating Procedure
    • Wet Processing
    • Dyeing
    • Fabric Dyeing and Printing
    • Fabric Cutting
    • Sewing
    • Garments Washing
    • Merchandising
      • Visual Merchandising
  • Fashion
  • Finance
    • Financial Calculation
    • Video Tutorial
    • Economics
    • Economy

ORDNUR

Textile and Finance

  • About
  • Contact
  • Privacy Policy
  • Terms and Conditions

Garments Cost of Making (CM): Meaning, Calculation, Example

Garments Cost of Making (CM)

One of the highest productive industries is a garment manufacturing industry where different types of products are manufactured. It is required to Calculate Garments Cost of Making time to time because the main motive of garments manufacturer is to make a profit. After making the garments it is offered to the buyers. But the problem is, what should be the required price of that item and how to calculate the cost of the garment of making (CM). To solve this problem first, you need to know the cost of making each garment and then add your markup price to set the selling price. Here the cost of making means the cost of manufacturing garments.

Monitoring garments making cost is necessary continuously so that trends of the cost of making can visible to the decision-makers and they actually know whether garments making cost is increasing or decreasing. Based on your change in garments cost of making you may take decisions accordingly.

Normally, CM cost or Cost of Making garments indicates the sewing line cost of each garment. But you can also calculate your whole factory cost of making each garment.

Calculate Garments Cost of Making

Here in this article, we will show you two different ways of calculating the Cost of Making (CM) of garments.

  • Normal Method of Calculation of CM
  • Effective Way of Calculation of CM

How to Calculate Garments Cost of Making

Pre Requirement of Calculation of  Garments Cost of Making

Before you start your costing by using the normal way, you need to know the followings:

  1. Total Cost (TC) = Fixed Cost (FC) + Variable Cost (VC)
  2. Production Capacity of Your Machine (Hourly)
  3. Total Effective Working Hours Per Day
  4. Number of Days Operation in a Month

Fixed Cost of Garments Making

Fixed Costs are those costs of garments manufacturing which are fixed in nature. With the increase in the number of units of production, your per-unit fixed cost will be reduced. Some examples of fixed costs are; salaries and wages, interest expense of bank loan, a rental expense of your factory building, depreciation expense of your fixed assets, etc.

Variable Cost of Garments Making

Variable cost is the cost which is change over an additional number of units of production. But per unit variable cost is fixed. The variable expense of garments making is; Utility (Electricity cost, Water cost, steam cost, Air cost) Expenditures, transportation cost, repair, and maintenance expense, etc. Here the most crucial variable cost is utility cost. We need to carefully handle the utility section to minimize utility costs.

Hourly Total Production Capacity of  Garments Machinery

To identify hourly total production capacity, you need to identify the total number of machines and the capacity of each machine. After that, you need to multiply the hourly capacity with the machine number.

Daily Production Capacity of  Garments

For calculating the daily production of your garments, you need to multiply your hourly effective production capacity into working hours each day.

Monthly Production Capacity of Garments

To calculate monthly production capacity you have to multiply your daily production capacity with the number of working days in a month.

Costing of Utility of Garments

  • Electricity: To get electricity cost you need to identify the total kW consumption of your factory and then multiply total KW with the Price of per Kw electricity. Remember the cost of electricity is much higher in the case of fuel generator and local REB compared with Gas Generator.
  • Water: Water cost is the cost of collecting water and the filtering cost. Normally in textile and garments, De-Mineralized (DM) water is used.
  • Steam: First identify the total consumption of steam per machine each hour and then multiply with the number of machines.
  • Compressed Air: In case of air you have to identify the compressed air cost per cubic meter then multiplies with the total consumption.

The Formula of Calculating Garments Cost of Making Considering Whole Factory Cost

Monthly Garments Cost of Making (GCM) = (Monthly Total Cost of Garments Operation)/Monthly Total Output Produced by the Factory.

  • Here Total Cost include both fixed and variable Cost of your garments factory for one month
  • Monthly total Production is the output produced by the factory.

Example: Suppose Your Factory Costing Related Information are;

  • Salary & Wages Expense Tk. 20,000,000
  • Monthly Interest on Bank Loan Tk. 100,000
  • Depreciation Expense is Tk. 50,000
  • Rental Expense of Building is Tk. 200,000
  • Transportation Cost is Tk. 150,000
  • Repair & Maintenance Expense is Tk. 50,000
  • Utility Expense is Tk 10,00,000 where Electricity Cost is Tk 500,000, Steam Tk. 200,000, Water Cost is Tk. 100,000, Chiller Cost Tk. 100,000, Compressed Air Cost is Tk. 100,000.
  • Total Number of Machine is 150
  • Hourly Production Capacity of Each Machine 30
  • The total Working hour is 8 hours per day
  • The number of working days in a month is 26 Days.

Total Cost = 20,000,000 + 100,000 + 50,000 + 200,000 + 150,000 + 50,000 +1,000,000 = 21,550,000

Total Production = 150 * 30 * 8 * 26 = 936,000

Cost of Garments Making Per Piece of Garments = (21,550,000/936,000) = Tk. 23.02 (Piece)

Effective Way of Calculation of Garments Cost of Making (CM)

  • Total Number of Machine = 180 Unit
  • Number of Workers Required = 200 Person
  • Total Working Hours a Day = 8 HOurs
  • Number of Working Days for a Given Month = 26 Days
  • Workers Efficiency = 65%
  • SMV of Trouser = 35 Minute
  • Available Minute = (200 Workers x 8 Hours x 26 Days x 60 Minute) X 65%
  • Available Minute = 16,22,400 Minutes in a Month

Fixed Cost of Garments Factory

  • Salary & Wages Expense Tk. 40,00,000 Monthly
  • Interest on Bank Loan Tk. 100,000 Monthly
  • Depreciation Expense is Tk. 50,000 Monthly
  • Rental Expense of Building is Tk. 200,000 Monthly
  • Transportation Cost is Tk. 150,000 Monthly
  • Repair & Maintenance Expense is Tk. 50,000 Monthly
  • Utility Expense is Tk 10,00,000 Monthly

Calculation of Cost Per Minute of Garments Factory

  • Salary = (40,00,000/16,22,400) = 2.47 Taka/Minute
  • Interest = (100,000/16,22,400) = 0.06 Taka/Minute
  • Depreciation = (50,000/16,22,400) = 0.03 Taka/Minute
  • Rental Expense = (2,00,000/16,22,400) = 0.12 Taka/Minute
  • Transportation = (150,000/16,22,400) = 0.09 Taka/Minute
  • Repair & Maintenance = (50,000/16,22,400) = 0.03 Taka/Minute
  • Utility Expense = (10,00,000/16,22,400) = 0.62 Taka/Minute
  • Total Cost Per Minute = 3.42 Taka/Minute

So, the Cost of Making (CM) of Trouser = 35 Minute x 3.42 Cost Per Minute = 119.7 Taka

Minute Value or Cost Per Minute of Sewing Line of Garments

For calculation of garments sewing line cost per minute, you can use the number of operators and helpers and determine the total available minutes. And then, divide the total wages and salary expenses of operators and works with the available minute.

Suppose Your Sewing Section has 30 machines and for this machine 30 operators and 5 helpers are working.

  • Total Salary Expense = ( 30 Operators * Average Monthly Salary) + (5 Helpers * Average Monthly Salary)
  • Salary and Wages Expense = (30*10000 Tk.) + (5 * 8000 Tk.) = 340000 Tk/Month.
  • Available Minute Per Month = ((30 operators+5 helpers)* (8 hours *60 minutes)) * 26 days = 436800 Minutes in a Month

CM of Garments = (340000/436800) = .78 Tk./Minute

If a garments need 45 minutes to make then the total cost of making the cost of that particular garments will be = (.78 TK * 45 minute) = 35.1 Tk./Per Piece

*(Calculation based on Assumption)

Here instead of Taka, you can use any other currency as required.

After reading this hopefully, you understand how to calculate garments cost of making. If you have any confusion then please let me know, I will try to clarify further.

Note: All these costing information is arbitrarily taken, so these values are not actual costing value.

Written by

Md. Nahian Mahmud Shaikat

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to email this to a friend (Opens in new window)

Related

Reader Interactions

Comments

  1. AK says

    February 8, 2020 at 1:46 pm

    thnX for these kind of details i m Entrepreneur

  2. rohmat says

    March 17, 2020 at 9:17 am

    i need to harmful cm of garments finishing format cell pls help me

  3. Md Anis Ahmed says

    September 17, 2020 at 1:55 pm

    Dear , I have to know Salary = (40,00,000 ok but where from /the=16,22,400) = 2.47 Taka/Minute
    Can you explain it 16,22,400 or what is this .

  4. Nahian Mahmud Shaikat says

    September 17, 2020 at 9:14 pm

    its came from available minute

    (200 worker x 8 hours a day x 60 minute x 26 days a month) x 65% efficiency = 16,22,400

  5. ismail says

    September 28, 2020 at 10:25 pm

    really super for garments emploe

  6. Charlene Steyn says

    November 3, 2020 at 2:12 pm

    Thank you for this easy and logical explanation!

  7. Swapanmiah says

    December 12, 2020 at 5:11 am

    Hmm

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

TOP ARTICLES

  • 27 Parts of a Sewing Machine With Details
  • Garments Quality SOP [updated]
  • Standard Minute Value: SMV in Garments, Calculation, Importance
  • 6 Principles of Finance You Must Know [Successful Financing]
  • Garments Cost of Making (CM): Meaning, Calculation, Example

Categories

Subscribe Us

Join 5,381 other subscribers

Copyright © 2021 ORDNUR

Go to mobile version
loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.