WordPress database error: [Table 'wp_yoast_seo_links' is marked as crashed and should be repaired] SELECT `target_post_id` FROM `wp_yoast_seo_links` WHERE `url` = 'http://ordnur.com/wp-content/uploads/2019/04/Layout-SMV-and-Operation-Breakdown-of-Garments-Finishing-Process-1024x925.jpg' LIMIT 1
WordPress database error: [Table 'wp_yoast_seo_links' is marked as crashed and should be repaired] SELECT `target_post_id` FROM `wp_yoast_seo_links` WHERE `url` = 'http://ordnur.com/wp-content/uploads/2019/04/Layout-SMV-and-Operation-Breakdown-of-Garments-Finishing-Process-1024x925.jpg' LIMIT 1
Your Guide to Apparel, Fashion, Finance & Lifestyle
Layout, SMV and Operation Breakdown of Garments Finishing Process
After completion of the sewing process, what process remains to complete finished garments is called garments finishing the process, also a different section. Not only the sewing process, but also finishing also important and have lots of processes like trimming, pressing, and quality inspection, ticketing, folding, and packing.
Operation Breakdown of Pant (Bottom) Finishing Process
Finishing is the last step before shipping garments. Here I am giving all process lists, SMV, Layout, and process-wise production targets. Hopefully, you will have a detailed idea of Layout, SMV, and Operation Breakdown of Garments Finishing Process.
Process Layout and Production Target of Pant Finishing
Process
NO
Operation/Process
Names
Type of
MNL OPR
100%
Worker
Count
TGT
–
–
Worker
SMV
TGT
–
–
–
1
Loop cut (5pcs 5 point)
H
0.25
240
1.13
1
240
2
Thread cut (top+in
side+Side seam+Hem fray clean)
H
1.2
50
5.44
5
250
3
Pkt clean(5pcs)
H
0.25
240
1.13
1
240
4
Re-Inforcement cut
(06 point)
H
0.2
300
0.91
1
300
5
Body carrying to iron
section & iron section to Q.I table
H
–
–
–
–
–
6
Inside Iron
IRN
0.25
240
1.13
1
240
7
Inside check
QI
0.4
150
1.81
2
300
8
Body turnover+ Gmts
counting
H
0.15
400
0.68
1
400
9
Top side check
QI
0.4
150
1.81
2
300
10
Alter rcetify
(Gmts+Label)
OP
0.25
240
1.13
1
240
11
Body carrying to btn
section & btn section to Q,I table
H
–
–
–
–
–
12
Shank Btn att.(01
pcs)
OP
0.1
600
0.45
1
600
13
Rivet attach (5ps)
OP
0.4
150
1.81
2
300
14
Button+Rivet check
QI
0.2
300
0.91
1
300
15
Thread sucking
H
0.1
600
0.45
1
600
16
Lather patch attach
OP
0.35
171
1.59
2
343
17
Full Body Iron
IRN
0.7
86
3.17
3
257
18
Measurement check 03
point
QI
0.4
150
1.81
2
300
19
Get up check
QI
0.4
150
1.81
2
300
20
Match book attach
PM
0.25
240
1.13
1
240
21
Price tag make
PM
0.35
171
1.59
1
171
22
Price Tag attach
PM
0.15
400
0.68
1
400
23
Label check/Shade
label cut
PM
0.25
240
1.13
1
240
24
Shade Sheparate
PM
0.3
200
1.36
1
200
25
Body sizing/Ratio
PM
0.25
240
1.13
1
240
26
Hard tag attach
PM
0.2
300
0.91
1
300
27
Leg sticker att+ Body
dust
H
0.3
200
1.36
1
200
28
Folding
PM
0.3
200
1.36
1
200
29
Poly close.
PM
0.25
240
1.13
1
240
30
Carton Close
PM
0.25
240
1.13
1
240
31
EDI + Carton sticker
attach
PM
0.2
300
0.91
1
300
–
TOTAL
–
9.05
–
41
41
292
Type of Worker
Count
Available
Short/Plus
PM
11
OP
6
QI
9
IRN
4
H
11
Total
41
Total Manpower
41
100% TGT
272
70% TGT
190
Layout, SMV and Operation Breakdown of Garments Finishing Process