Published benchmark figures for electricity, gas and steam per kilogram of fabric processed, and where real mill performance tends to diverge.
How to Calculate Machine Requirement for a Garment Line
Step by step method to work out how many machines a sewing line needs, using SMV, target output and efficiency, with a worked example.
Rooftop Solar for Garment Factories: Payback Period in Bangladesh
What rooftop solar costs per kW in Bangladesh, how net metering works, and the payback period a garment factory can realistically expect.
Automatic Cutting Machine vs Manual Cutting: A Cost Comparison
Compares automatic and manual fabric cutting on cost per ply, fabric utilisation, labour and payback, with the volumes where automation makes sense.
Why Your Support System Might Be the Key to Your Recovery
It is often said that recovery is a journey, and it is true. But nobody does it entirely alone. The Continue Reading
Heat Recovery from Dyeing Effluent: Methods and Payback
How heat exchangers recover energy from hot dyeing effluent, the fouling problems that follow, and the payback these systems typically deliver.
